TM 5-3805-261-34CHARGING SYSTEM MAINTENANCE.4-5.Alternator(Bosch).(Sheet 3 of 12)DISASSEMBLYNOTETesting of regulator is necessary prior to removal.8.Test regulator (17, Figure 4-21). Refer toTesting, step 4.9.Remove two screws (13) and lockwashers (14).10. Separate regulator (17) from frame (54)exposing field coil (24) wire assembly and diodeassembly (39) wire assembly terminals.11. Remove two screws (15) and lockwashers (16).12. Disconnect field coil (24) wire assembly anddiode assembly (39) wire assembly at terminalsfrom regulator (17).13. Remove regulator (17) from frame (54).NOTETesting of field coil is necessary prior to furtherdisassembly of alternator.14. Test field coil (24). Refer to Testing, step 6.Figure 4-21.Go to Sheet 44-25
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business