TM 5-3805-261-34ENGINE MAINTENANCE.(cont)3-12. RockerArmAssembly.(Sheet 10 of 13)INSTALLATION (cont)33.Lubricate eight lifters (4) and push rods (3)with clean oil and install in cylinder head inoriginal positions. Install falt end of eight lifters(4) first and ball end of push rods (3) to matewith lifters (4, Figure 3-47).34.Cover threads of one bolt (1) with tape toprotect preformed packing (46) in bracket (45).35.Install washer (2) and bolt (1) with tapedthreads through bolt hole in bracket (45), thenremove tape.36.Install three washers (2) and bolts (1) throughbrackets (34, 23 and 12).37.Apply anti-seize compound to threads of fourbolts (1).38.Install items 55 thru 5 and 2 and 1 as anassembly.CAUTIONAdjusting screws must be loose andseated on push rods before installing bolts.39.Tighten four bolts (1) in sequence (Figure 3-61). First tighten to 115 ft-lb torque, thentighten to 185 ft-lb torque. Finally, repeat 185ft-lb torque tightening sequence.Go to Sheet 113-74Figure 3-61.Figure 3-47.
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business