TM 5-3805-261-23-1
OIL COOLER TO RELIEF VALVE AND HYDRAULIC
TANK LINES AND FITTINGS REPLACEMENT - CONTINUED
0250 00
REMOVAL - CONTINUED
5.
Disconnect tube (18) and hose assemblies (20, 21, and
26
22) from bottom of hydraulic tank.
11
6.
Remove and discard preformed packings (17, 19, 12,
25
and 23).
12
24
7.
Remove connector (16), preformed packing (15), con-
13
nector (14), and preformed packing (13). Discard pre-
formed packings.
14
8.
Remove connector (11), preformed packing (26), con-
nector (24), and preformed packing (25). Discard pre-
15
formed packings.
23
16
22
17
21
20
18
19
397-1645
9.
Loosen two clamps (33).
27 28
29
10.
Remove nut (27), washer (28), clip (29), and move
wires and cable assemblies to one side.
11.
Remove hose (34), two clamps (33), and tube (18)
from machine.
12.
Remove tube assembly (32), connector (31), and pre-
formed packing (30) from junction block under right-
center of cab. Discard preformed packing.
30
397-1646
34
33
18
32 31
33
0250 00-3