TM 5-3805-261-23-1
OIL COOLER TO RELIEF VALVE AND HYDRAULIC
TANK LINES AND FITTINGS REPLACEMENT - CONTINUED
REMOVAL
1.
Loosen two clamps (8).
CAUTION
Cap hose and tube ends and plug open ports to prevent contamination.
NOTE
Tag hose and tube assemblies before disconnecting to aid in installation.
2.
Remove hose (3) and two clamps (8) from under right-rear of cab.
3.
Remove four bolts (9), seat (2), tube (10), and preformed packing (1) from right-bottom side of hydraulic tank. Discard
preformed packing.
4.
Remove four bolts (6), flange (5), elbow (7), and preformed packing (4) from hydraulic pump under right-rear of cab.
Discard preformed packing.
1
2
4
3
5
6
10
7
9
8
397-1644
0250 00-2