TM 5-3805-261-23-1
OIL COOLER TO RELIEF VALVE AND HYDRAULIC
TANK LINES AND FITTINGS REPLACEMENT - CONTINUED
0250 00
REMOVAL - CONTINUED
32.
Disconnect hose assembly (80) from connector (85) of hydraulic pump under center of cab. Remove and discard pre-
formed packing (86).
33.
Remove hose assembly (80) from machine.
34.
Remove connector (85) and preformed packing (84). Discard preformed packing.
35.
Remove hose assembly (22) from elbow (82) of hydraulic unloading valve. Remove and discard preformed packing
(83).
36.
Remove hose assembly (22) from machine.
37.
Remove elbow (82) and preformed packing (81). Discard preformed packing.
80
86
85
82
81
83
84
22
397-1655
CLEANING AND INSPECTION
Clean and inspect all parts in accordance with WP 0020 00.
INSTALLATION
1.
Install new preformed packing (81) and elbow (82) to hydraulic unloader valve.
2.
Position hose assembly (22) to machine.
3.
Install new preformed packing (83) and connect hose assembly (22) to elbow (82).
4.
Install new preformed packing (84) and connector (85) to hydraulic pump.
5.
Position hose assembly (80) to machine.
6.
Install new preformed packing (86) and connect hose assembly (80) to connector (85).
0250 00-8