TM 5-3805-261-23-1
HYDRAULIC PUMP AND CONTROL VALVE LINES AND FITTINGS REPLACEMENT - CONTINUED
0249 00
INSTALLATION - CONTINUED
26.
Install new preformed packing (23) and connector (22) to combination valve (17).
27.
Position hose assembly (5) on machine. Install new preformed packing (21) and connect hose assembly to connector
(22).
28.
Install new preformed packing (18) and connector (19).
29.
Position hose assembly (12) on machine. Install new preformed packing (20) and connect hose assembly to connector
(19).
17
23
22
21
5
18
12 20 19
397-1631
2
1
30.
Install new preformed packing (2) and connector (3)
3
4
5
on left hydraulic control valve (16).
6
31.
Install new preformed packing (4) and connect hose
assembly (5) to connector (3).
16
32.
Install two clips (6) with washer (8) and bolt (7).
33.
Install new preformed packing (1) and connector (11).
34.
Install new preformed packing (10) and connect hose
assembly (9) to connector (11).
35.
Install new preformed packing (15) and elbow (14).
7
36.
Install new preformed packing (13) and connect hose
8
assembly (12) to elbow (14).
37.
Start engine (TM 5-3805-261-10).
38.
Operate control levers and cycle system through at
least five full-travel movements to bleed air from sys-
9
tem.
39.
Stop engine and check for leaks.
10
397-1630
12
14
15
11
13
40.
Check hydraulic oil level and fill as necessary (WP
END OF WORK PACKAGE
0249 00-12