TM 5-3805-261-10
ADVANCED OPERATION AND OPERATOR TIPS - CONTINUED
0006 00
TRAVELING AND EARTH MOVING OPERATIONS - CONTINUED
Road Building - Flat Bottom Ditch Method - Continued
4.
Finish the bank slope and flatten bottom ditch out.
397-1020
5.
Clean the ditch and clean the inside slope.
397-1021
6.
Finish shoulder pass then level and finish.
397-1022
0006 00-28