TM 5-3805-261-10
ADVANCED OPERATION AND OPERATOR TIPS - CONTINUED
0006 00
TRAVELING AND EARTH MOVING OPERATIONS - CONTINUED
Road Building - Flat Bottom Ditch Method
NOTE
Steps in this procedure are for one side. Repeat these steps on the opposite side.
1.
Flatten the inside slope.
397-1017
2.
Left hand trench cut to bottom width and depth.
397-1018
3.
Clean the shoulder and spread to center.
397-1019
0006 00-27