TM 5-3805-261-10
ADVANCED OPERATION AND OPERATOR TIPS - CONTINUED
0006 00
TRAVELING AND EARTH MOVING OPERATIONS - CONTINUED
Road Building - "V" Ditch Method
3.
Level to center and perform another heavy cut.
397-1003
397-1004
4.
Clean shoulder and spread to center.
397-1005
397-1006
5.
Slope and bank back side of ditch then clean the bottom.
397-1008
397-1007
0006 00-22