TM 5-3805-293-23-5
0331
COOLANT HEATER INSTALLATION CONTINUED
000331
69. Install tiedown strap (Figure 55, Item 6) on block heater fuel supply line (Figure 55, Item 7).
70. Install two clamps (Figure 55, Items 1 and 4), washer (Figure 55, Item 2), and bolt (Figure 55, Item 3) on fuel
supply line (Figure 55, Item 7) and bracket (Figure 55, Item 5).
Figure 55. Block Heater Fuel Supply Line Routing.
0331