62
TM 5-3805-293-23-5
FIELD MAINTENANCE
-
ARCTIC KIT INSTALLATION INSTRUCTIONS
0
331
Installation, Battery Box Installation, Battery Cable Installation, Coolant Heater Installation
INITIAL SETUP
Tools and Special Tools
Personnel Required
0
0
Tool Kit, General Mechanic's
Two
0
0
Equipment Conditions
0
Die and Tap Set, Thread (S0186)
Machine parked (TM 5-3805-293-10)
0
0
Engine coolant drained (WP 0052)
0
0
Battery cables disconnected (WP 0194)
Saw, Hand, Metal Cutting (S0278)
0
0
Drawings Required
0
Tape, Measuring, 25' (S0697)
TM 5-3805-293-24P, Figure 156, 157, 158
0
0
Wrench, Combination, 1-1/16" (S0787)
Estimated Time to Complete
0
0
13.0 Hr
0
Wrench, Combination, 1-1/8" (S0788)
0
Wrench, Combination, 1-3/8" (S0791)
0
Lifting Device (100-lb [45-kg] minimum
0
capacity)
0
Materials/Parts
0
0
0
0
Cotter Pin (2)
0
O-ring
0
0331-1