TM 5-3805-293-23-5
0314
INSTALLATION
000314
N OT E
Install all lines as marked and tagged during removal.
1. Install new O-ring (Figure 6, Item 6) and connect tube (Figure 6, Item 7) to front valve (Figure 6, Item 1).
2. Install new O-ring (Figure 6, Item 9) and connect hose (Figure 6, Item 8) to tube (Figure 6, Item 7).
3. Install new O-ring (Figure 6, Item 2) and connect tube (Figure 6, Item 3) to front valve (Figure 6, Item 1).
4. Install new O-ring (Figure 6, Item 4) and connect hose (Figure 6, Item 5) to tube (Figure 6, Item 3).
Figure 6. Front Valve.
0314