TM 5-3805-293-23-5
0296
INSTALLATION CONTINUED
N OT E
Lightly coat new O-rings with refrigerant compressor oil prior to installation.
8. Install new O-ring (Figure 10, Item 3) and A/C hose (Figure 10, Item 1) on accumulator (Figure 10, Item 2).
9. Install new O-ring (Figure 10, Item 5) and A/C hose (Figure 10, Item 4) on receiver/dryer (Figure 10, Item 1).
Figure 10. A/C Hose Connections at Cab.
0296