TM 5-3805-293-23-3
0059
INSTALLATION
00059
N OT E
Install wires as noted during removal.
1. Install new O-ring (Figure 2, Item 4) and hydraulic oil temperature sensor (Figure 2, Item 2) on fan block
(Figure 2, Item 1).
2. Connect electrical connector (Figure 2, Item 3) to hydraulic oil temperature sensor (Figure 2, Item 2).
3. Install fan guard (Figure 3, Item 3), six washers (Figure 3, Item 2), and bolts (Figure 3, Item 1) on machine.
Figure 3. Fan Guard.
0059
END OF TASK
FOLLOW-ON TASKS
00059
1. Connect battery cables (WP 0194).
2. If equipped, install arctic heater battery box (WP 0335).
3. Start engine and check cooling fan for proper operation (TM 5-3805-293-10).
END OF TASK
END OF WORK PACKAGE