POWER TRAINDISASSEMBLY AND ASSEMBLYTM 5-3805-263-14&P-2TRANSMISSIONDISASSEMBLE TRANSMISSIONstart by:a) remove transmission1. Install the transmission on tooling (C).Remove bolts (1) and the lockwashers thathold the cover to the transmission. Removecover (2).2. Remove links (3) from the transmissionhydraulic control valves.3. Remove bolts (8) and plates (7). Move thefour sleeves (5) free of the transmissionhydraulic control valves.NOTE: Do not remove bolts (4) and (6) at thistime. Bolts (4) and (6) hold the control valves tothe transmission.4. Install a 3/8”-16 NC forged eyebolt in thetransmission case. Install tooling (B) in theeyebolt.5. Install tooling (A) on the transmission caseand on the control valves. Connect tooling(B) to tooling (A) as shown. Remove bolts(4) and (6). Remove transmission hydrauliccontrol valves (9) with tooling (B). Weight is90 lb. (41 kg). See DISASSEMBLE HY-DRAULIC CONTROL VALVES for dis-assembly of the control valves.6. Remove the four sleeves from the transmis-sion. Fasten tooling (D) to the lifting eyeson top of the transmission. Remove thebolts that hold the transmission to tooling(C). Remove the bolts and cover (10).2-88
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business