TM 5-3805-263-14&P-3
OPERATOR'S STATION
CENTERSHIFT LOCK CONTROL VALVE
DISASSEMBLE CENTERSHIFT LOCK
CONTROL VALVE
start by:
a) remove centershift lock control valve
1.
Remove pin (4) that holds lever (3) to body (1).
Remove lever (3).
2.
Remove two plungers (2) and springs (5) from the
body. Remove the O-ring seals from the plungers.
3.
Remove bolts (6) and cover (8) from body (1).
Remove O-ring seal (9) from the cover.
4.
Remove springs (7) and valves (10) from the body.
ASSEMBLE CENTERSHIFT LOCK CONTROL
VALVE
1.
Install new O-ring seals if necessary.
2.
Put two springs (4) in position on two plungers (2).
Put two plungers (2) in position in body (3).
3.
Put lever (1) in position on the body. Install the pin
that holds it.
4.
Put two valves (5) and two springs (6) in position in
the body.
5.
Put cover (7) in position on the body. Install the
bolts that hold it.
end by:
a) install centershift lock control valve
4-95/(4-96 Blank)