TM 5-3805-263-14&1P-3
DRIVE FOR THE CIRCLE
(1)
Torque for bolts in
motor (seven) ................. 5Q a 5 lb ft (70 + 7 N-m)
(2)
Shims, use as needed to get preload
preload (tight) ..... 000 to 005 in (O 00 to 0 13 mm)
(3)
(4)
Torque for nuts (four) on studs
for installing housing on
drawbar frame ........... 35040 lb ft (470 + 55 N-m)
(5)
Torque for nuts on
bolts (nine)................. 20018 lb ft (270 _ 24 N-m)
Torque for nut............ 11015 lb ft (150 20 N-m)
(6)
METERING VALVE FOR STEERING
(4T3199)
(1) Initial dry torque for bolts (seven)
........................................ 10+2 lb. ft. (143 N-m)
Final torque for bolts (seven)21 + 2 lb. ft. (28 + 3
N-m)
(2) Torque for plug ............ 8 lb. ft. (I I N-m)
Plug to be flush with or below mounting surface.
GEAR POSITION IN PUMP:
The center between two of the six teeth on gear (5)
must be in
alignment with pin (3) In the groove In driver (4)
when gear (5)
is installed on the splines of driver (4) as shown.
STEERING METERING PUMP
(366880)
Tighten seven bolts (dry) in number
sequence to ................................. 10+2 lb ft (14+3 N-m)
Tighten again in number
sequence to ............................. 21 2 lb ft (28 3 N-m)
3-107