TM 5-3805-261-34REAR AXLE MAINTENANCE.14-18. DifferentialCarrier. (Sheet 7 of 7)ASSEMBLY19. Insert two .250 inch dowels insplines of shaft (11) 180 degreesapart. Install socket over shaft(11) and two dowels (Figure14-146).20. Using socket and torque wrench,check amount of torque needed tomove shaft (11, Figure 14-147)without preload.21. Using ratchet, hold shaft (11)while tightening nut (8) to 6in-lb torque above the measuredtorque without preload.22. Remove socket from shaft (11).23. Bend tabs of lock (9) over nut(8).24. Install new preformed packings (7thru 3, Figure 14-148).25. Install tubes (2 and 1) incarrier (31).26. Install differential assembly andbearing cap. Refer to paragraph14-17, steps 2 thru 13.NOTEReturn 130G Grader tooriginal equipment condition.Figure 14-147.Figure 14-146.Figure 14-148.End of Task14-107
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business