TM 5-3805-261-34TRANSMISSION MAINTENANCE. (cont)14-4. TransmissionAssembly:PlanetaryGroup,Disassembly/Assembly. (Sheet 2of 19)DISASSEMBLY1. Remove 12 bolts (1) and washers(2, Figure 14-39).2. Remove plug (3), preformedpacking (4). Discard preformedpacking (4).Weight of housing is approxi-mately 85 lbs. Use adequatehoist and sling for lifting.Failure to follow this proce-dure may cause INJURY. Ifyou are injured, seek medicalaid immediately.3. Using hoist and sling, lifthousing (13) slightly to removefour plungers (5), springs (6)and dowels (7, Figure 14-40).4. Remove dowel (8) from housing(13).5. Using hoist and sling, removeitems 9 thru 13 as an assembly(Figure 14-41) and positionupside down and remove hoist andsling and eyebolt.6. Remove seal (9) and seal rings(10, 11 and 12) from housing (13,Figure 14-42).Go to Sheet 3WARNINGFigure 14-39.Figure 14-40.Figure 14-41.Figure 14-42.14-30
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business