• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
DRAWBAR ASSEMBLY REPLACEMENT - CONTINUED
DRAWBAR ASSEMBLY REPLACEMENT - CONTINUED

Maintenance Manual For Grader, Road, Motorized, Diesel Engine Driven, Heavy, Commercial Construction Equipment
Page Navigation
  487    488    489    490    491  492  493    494    495    496    497  
img
TM 5-3805-261-23-2
DRAWBAR ASSEMBLY REPLACEMENT - CONTINUED
0342 00
INSTALLATION - CONTINUED
WARNING
Use extreme caution when handling heavy parts. Provide adequate support and use assistance during proce-
dure. Ensure that any lifting device used is in good condition and of suitable load capacity. Keep clear of
heavy parts supported only by lifting device. Failure to follow this warning may cause injury or death to per-
sonnel.
NOTE
SLING
10
11
Drawbar weighs 500 lb (227 kg).
12
9
4.
Attach sling to front of drawbar (1).
1
5.
Raise front of drawbar (1) into mounting position.
6.
Install two bolts (10), four washers (11), and bolts (9)
in cap (12) at front corner of drawbar (1). Tighten
bolts to 367 to 397 lb-ft (498 to 538 Nm).
13
15 14
JACK STAND
397-1687
7.
Remove sling.
8.
Install two shims (2), inserts (3 and 4), two shims (5), cap (6), two washers (7), and bolts (8) in rear corners of drawbar
(1).
9.
Use hydraulics to raise rear of drawbar (1).
10.
Remove jack stands.
SLING
1
2
3
4
5
6
JACK STANDS
7
397-1686
8
0342 00-4


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.