• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
BLADE LIFT ARM REPLACEMENT - CONTINUED
BLADE LIFT ARM REPLACEMENT - CONTINUED

Maintenance Manual For Grader, Road, Motorized, Diesel Engine Driven, Heavy, Commercial Construction Equipment
Page Navigation
  480    481    482    483    484  485  486    487    488    489    490  
img
TM 5-3805-261-23-2
BLADE LIFT ARM REPLACEMENT - CONTINUED
0341 00
REMOVAL - CONTINUED
4.
Remove pin (9), four washers (8), two washers (11), and blade lift arm (10).
5.
Remove sling.
6.
Remove four seals (12) and two bearings (13). Discard seals.
8
9
10
8
11
11
12
13
12
397-1681
7.
Remove two bolts (14), washers (15), retainer (16),
20
5
seals (17 and 18), shim(s) (19, 24, and 25), and wash-
ers (21, 22, and 23) from arm (5) and yoke (20). Dis-
card seals.
19
18
17
16
15
14
21
24 23 22
25
397-1682
0341 00-3


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.