• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
FRAME SEPARATION AND CONNECTION REPLACEMENT (CCE AND TYPE I MACHINES) - CONTINUED
FRAME SEPARATION AND CONNECTION REPLACEMENT (CCE AND TYPE I MACHINES) - CONTINUED

Maintenance Manual For Grader, Road, Motorized, Diesel Engine Driven, Heavy, Commercial Construction Equipment
Page Navigation
  340    341    342    343    344  345  346    347    348    349    350  
img
TM 5-3805-261-23-2
FRAME SEPARATION AND CONNECTION REPLACEMENT
(CCE AND TYPE I MACHINES) - CONTINUED
0324 00
CLEANING AND INSPECTION
Clean and inspect all parts in accordance WP 0020 00.
INSTALLATION
1.
Position forklift under rear frame and remove jack stands.
2.
Apply shop air supply line to elbow (58) on parking brake actuator (56) and release parking brake
3.
Move rear frame (59) into position on front frame (60) using forklift.
4.
Use forklift to lift or lower rear frame (59) and hydraulic jack to move frame from side to side. Align bottom pin bore of
rear frame with pin bore of front frame (60).
45
47
46
55
44
53
49
50
397-1946
397-1953
NOTE
Install plate to hold spacer in place.
5.
Install spacer (55), plate (53), six bolts (50), and new
lockwashers (49).
6.
Lower temperature of pin (44) and install plate (46),
two new lockwashers (47), and bolts (45).
0324 00-9


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.