TM 5-3805-261-23-1
PREVENTIVE MAINTENANCE CHECKS
AND SERVICES (PMCS) PROCEDURES - CONTINUED
0023 00
LOCATION
ITEM TO
ITEM
MAN-
CHECK/
NOT FULLY MISSION
NO.
INTERVAL
HOURS
SERVICE
PROCEDURE
CAPABLE IF:
Check oil level in both front axle spin-
21
500 Hours
0.5
Front Axle
dles.
or Semi-
Spindle
Annually
a. Remove plug (3).
b. Oil level should be up to bottom of
fill plug opening.
c. Add oil as necessary (Item 20 or 21,
d. Install plug (3).
WARNING
Tires
22
500 Hours
or Semi-
Explosions of air-inflated earth moving tires can be a result of
Annually
heat-induced gas combustion inside the tires. The heat gener-
ated by welding or heating rim components, external fire or
excessive use of brakes can result in gaseous combustion. A
tire explosion is much more violent than a blowout. The explo-
sion can propel the tire, rim and final drive components as far
as 1,500 ft (460 m) or more. Both the force of the explosion
and flying debris can cause injury or damage to equipment. All
personnel should be aware of this danger and the actions to
take to minimize the risk.
Improper or misuse of inflation equipment can result in tire
blowout or rim failure.
a. Check for adequate tread and
replace if tread depth is insufficient
b. Check for proper inflation of 35 psi
(241 kPa) (TM 5-3805-261-10).
ROPS/FOPS Ensure ROPS/FOPS bolts are tight-
23
1000 Hours
ened to 864 lb-ft (1,171 Nm).
or Semi-
Annually
a. Drain and refill transmission/differ-
0.5
Transmis-
24
1000 Hours
ential oil and clean screens (WP
or Semi-
sion and Dif-
Annually
ferential
b. Change transmission breather (WP
Adjust valve lash (WP 0274 00).
25
2000 Hours
Valve Lash
or Annually
Adjustment
0023 00-7