TM 5-3805-261-23-1
PREVENTIVE MAINTENANCE CHECKS
AND SERVICES (PMCS) PROCEDURES - CONTINUED
0023 00
LOCATION
ITEM TO
ITEM
MAN-
CHECK/
NOT FULLY MISSION
NO.
INTERVAL
HOURS
PROCEDURE
CAPABLE IF:
SERVICE
9
(Con't)
Inspect fuel/water separator and install
Fuel/Water
10
500 Hours
Separator (If new element if water saturation level
or Semi-
is at top of element.
Equipped)
Annually
a. Close fuel supply valve (5).
b. Drain fuel/water separator into con-
tainer by opening vent valve (2)
and drain valve (4).
c. Disconnect retaining clamp (3)
remove element (1). Discard ele-
ment.
d. Clean sealing surfaces and install
new element.
e. Install retaining clamp (3).
f. Close vent valve (2) and drain
valve (4).
g. Open fuel supply valve (5).
2 (HIDDEN)
3
1
397-1091
4 (HIDDEN)
5
0023 00-3