TM 5-3805-261-20HYDRAULIC SYSTEM MAINTENANCE.15-14.RightBladeLiftCheckValve.(Sheet 2 of 4)REMOVALNOTEAll hose and tube assemblies must betagged before disconnecting to aid ininstallation. Cap all hose and tubeends to prevent contamination.1.Disconnect tee (1, Figure 15-20).2.Disconnect tee (2).3.Disconnect hose assembly (3).4.Disconnect hose assembly (4).5.Remove three bolts (5), washers (6) anditems 7 thru 15 as an assembly.6.Remove elbow (7) and preformed packing(8, Figure 15-21). Discard preformedpacking (8).7.Remove elbow (9) and preformed packing(10). Discard preformed packing (10).8.Remove elbow (11) and preformed packing(12). Discard preformed packing (12).9.Remove elbow (13) and preformed packing(14). Discard preformed packing (14).CLEANINGClean all parts. Refer to Chapter 2.Figure 15-20.Figure 15-21.Go to Sheet 315-47
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business