TM 5-3805-261-20HYDRAULIC SYSTEM MAINTENANCE.15-13.CentershiftCheckValve.(Sheet 4 of 4)INSTALLATION5.Install new preformed packing (10) andconnector (9, Figure 15-18).6.Install new preformed packing (8) anconnector (7).7.Connect hose assemblies (6 and 5).WARNINGOnly a qualified operator may performthe next procedure. All otherpersonnel must clear the immediatearea. Failure to follow this proceduremay cause INJURY. If you areinjured, seek medical aid immediately.8.Start engine. Refer to TM 5-3805-261-10.9.Operate circle centershift control lever.Move system through at least five fullmovements of travel to bleed air from thesystem.10.Stop engine.11.Inspect hose assemblies and connectionsfor leaks.12.Refill hydraulic tank to proper level. Refer toLO 5-3805-261-12.13.Install frame cover (4), nine washers (3 and2) and bolts (1).NOTEReturn 130G Grader to originalequipment condition.Figure 15-18.End of Task15-45
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business