TM 5-3805-261-20
HYDRAULIC SYSTEM MAINTENANCE. (cont.)
15-14. Right Blade Lift Check Valve. (Sheet 3 of 4)
INSPECTION
Inspect all parts. Refer to Chapter 2.
INSTALLATION
1.
Install new preformed packing (14) and
elbow (13) to valve assembly (15, Figure
15-21).
2.
Install new preformed packing (12) and
elbow (11) to valve assembly (15).
3.
Install new preformed packing (10) and
elbow (9) to valve assembly (15).
4.
Install new preformed packing (8) and elbow
(7) to valve assembly (15).
5.
Position items 15 thru 7 as an assembly
(Figure 15-20) with two holes facing front of
vehicle on right side of front frame.
6.
Install three washers (6) and bolts (5).
7.
Connect hose assembly (4).
8.
Connect hose assembly (3).
9.
Connect tee (2).
10.
Connect tee (1).
Figure 15-20.
Go to Sheet 4
Figure 15-21.
15-48