TM 5-3805-261-20
WIRING HARNESS MAINTENANCE. (cont)
7-136.
Supplemental Steering Pump Power Leads.
(Sheet 3 of 5)
REMOVAL (cont)
11.
Remove bolt (19), washer (20) and clip (21,
Figure 7-226) from rear, right side of
engine.
12.
Remove bolt (22), washer (23) and clip (24)
from rear, right side of engine.
13.
Remove nut (25) and washers (26 and 27)
from starting motor.
14.
Remove wire assembly (28) from starting
motor.
15.
Remove nut (29) and washer (30 and 31)
from starting motor.
16.
Remove wire assembly (32) from starting
motor.
CLEANING
Clean all parts. Refer to Chapter 2.
INSPECTION
Inspect all parts. Refer to Chapter 2.
Figure 7-226
Go to Sheet 4
7-358