TM 5-3805-261-20
ENGINE MAINTENANCE. (cont)
6-10.
Turbocharger Oil Lines. (Sheet 4 of 4)
INSTALLATION (cont)
6.
Install new preformed packing (12) and
connector
(11,
Figure
6-23)
into
injection pump support.
7.
Install tube assembly (7).
8.
Connect tube assembly (7) nut. Do
not tighten tube assembly (7) nut.
9.
Install pin (9) and cotter pin (8) into
throttle linkage.
10.
Install new gasket (10) between flange
of tube assembly (7) and top of
turbocharger.
11.
Install bolts (6 and 5, Figure 6-22).
12.
Tighten tube assembly (7) nut on
injection pump support.
13.
Install four clips (4), two bolts (3), four
washers (2) and two nuts (1) on right
side of engine.
NOTE
Return
130G
Grader
to
original
equipment condition.
End of Task
Figure 6-23.
Figure 6-22.
6-34