TM 5-3805-261-20HYDRAULIC SYSTEM MAINTENANCE. (cont)15-30.Sideshift Lines.(Sheet 8 of 8)INSTALLATION(cont)14.Install clamp (9), two spacers (8), clamp (7),two washers (6) and bolts (5, Figure 15-139).15.Install new preformed packings (4 and 3)and connectors (2 and 1, Figure 15-138) toleft control valve group.16.Connect hose assemblies (14 and 13,Figure 15-137) to left control valve group.17.Connect two hose assemblies. Refer toparagraph 15-24, steps 14 and 15.WARNINGOnly a qualified operator mayperform the next procedure. All otherpersonnel must clear the immediatearea. Failure to follow this proceduremay cause INJURY. If you areinjured, seek medical aidimmediately.18.Start engine. Refer to TM 5-3805-261-10.19.Operate side shift control lever. Movesystem through at least five full movementsof travel to bleed air from system.20.Stop engine.21.Inspect hose assemblies and connectionsfor leaks.22.Refill hydraulic tank to proper level. Referto LO 5-3805-261-2.NOTEReturn 130G Grader to originalequipment condition.Figure 15-139.Figure 15-138.Figure 15-137.End of Task15-170
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business