• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 28. Negative Battery Cable Connection.
Table 3. Coolant Heater Installation Parts List.

Maintenance Manual For Motorized Road Grader Model 120M - 5 Page Navigation
  606    607    608    609    610  611  612    613    614    615    616  
img
.
TM 5-3805-293-23-5
0331
BATTERY CABLE INSTALLATION CONTINUED
000331
WARN I N G
Use extreme caution when handling heavy parts. Provide adequate support and use
assistance during procedure. Failure to follow this warning may cause injury or death to
personnel.
N OT E
Battery lid assembly weighs 50 lb (23 kg).
Battery lid assembly comes assembled.
54. With assistance, install battery lid assembly (Figure 29, Item 1) on battery box (Figure 29, Item 2) and secure
with two latches (Figure 29, Item 3).
Figure 29. Battery Lid Assembly.
0331
END OF TASK
0331-29


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.