• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 7. Mounting Assemblies.
Table 2. Battery Cable Installation Parts List.

Maintenance Manual For Motorized Road Grader Model 120M - 5 Page Navigation
  586    587    588    589    590  591  592    593    594    595    596  
img
.
TM 5-3805-293-23-5
0331
BATTERY BOX INSTALLATION CONTINUED
000331
WARN I N G
Use extreme caution when handling heavy parts. Provide adequate support and use
assistance during procedure. Failure to follow this warning may result in injury or death to
personnel.
N OT E
Each battery weighs 119 lb (54 kg).
8. With assistance, install two batteries (Figure 9, Item 7) in support assembly (Figure 9, Item 1) with post toward
center of support assembly.
9. Install two washers (Figure 9, Item 6), jamnuts (Figure 9, Item 5), and rods (Figure 9, Item 2) on support
assembly (Figure 9, Item 1).
10. Install battery clamp (Figure 9, Item 8), two washers (Figure 9, Item 4) and locknuts (Figure 9, Item 3) on rods
(Figure 9, Item 2).
Figure 9. Battery and Clamp.
0331
END OF TASK
0331-9


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.