TM 5-3805-293-23-4
0254
INSTALLATION CONTINUED
000254
16. Install new O-ring (Figure 13, Item 3) and connect hose (Figure 13, Item 1) to tube (Figure 13, Item 2).
17. Install new O-ring (Figure 13, Item 4) and connect hose (Figure 13, Item 6) to elbow (Figure 13, Item 5).
18. Install bolt (Figure 13, Item 10), two clamps (Figure 13, Item 7), washer (Figure 13, Item 8), and nut (Figure 13,
Item 9) on two hoses (Figure 13, Items 1 and 6).
Figure 13. Right-Side Articulation Cylinder.
0254
END OF TASK
FOLLOW-ON TASKS
000254
1. Install fuel tanks (WP 0229).
END OF TASK
END OF WORK PACKAGE