TM 5-3805-293-23-4
0242
INSTALLATION CONTINUED
15. Install new O-ring (Figure 18, Item 18) and tube (Figure 18, Item 19) on steering control valve (Figure 18, Item
1).
16. Install new O-ring (Figure 18, Item 17) and tube (Figure 18, Item 16) on steering control valve (Figure 18, Item
1).
17. Install new O-ring (Figure 18, Item 3) and tube (Figure 18, Item 2) on steering control valve (Figure 18, Item 1).
18. Install new O-ring (Figure 18, Item 14) and tube (Figure 18, Item 15) on steering control valve (Figure 18,
Item 1).
19. Install new O-ring (Figure 18, Item 10) and pressure supply hose (Figure 18, Item 11) on steering control valve
(Figure 18, Item 1).
20. Install split flange (Figure 18, Item 9), four washers (Figure 18, Item 13), and bolts (Figure 18, Item 12) on
steering control valve (Figure 18, Item 1).
21. Install new O-ring (Figure 18, Item 8), pressure supply tube assembly (Figure 18, Item 5), four washers (Figure
18, Item 6), and bolts (Figure 18, Item 7) on steering control valve (Figure 18, Item 1).
22. Connect front attachment wiring harness connector (Figure 18, Item 4) to steering control valve (Figure 18,
Item 1).
Figure 18. Steering Control Valve Side Tube.
0242