TM 5-3805-293-23-4
0242
INSTALLATION CONTINUED
12. Install new O-ring (Figure 17, Item 7) and load sense tube (Figure 17, Item 8) on pilot shuttle valve (Figure 17,
Item 6).
13. Install clamp (Figure 17, Item 9), clip (Figure 17, Item 12), washer (Figure 17, Item 11), and bolt (Figure 17,
Item 10) on front frame.
14. Install two clamps (Figure 17, Item 5), clip (Figure 17, Item 1), washer (Figure 17, Item 3), and bolt (Figure 17,
Item 2) on bracket (Figure 17, Item 4).
Figure 17. Load Sense Tube.
0242