TM 5-3805-293-23-4
0220
INSTALLATION CONTINUED
000220
10. Install grommet (Figure 9, Item 9) and drain tube (Figure 9, Item 8) on platform (Figure 9, Item 7).
11. Install ether injection tube (Figure 9, Item 12), clip (Figure 9, Item 15), washer (Figure 9, Item 13) and bolt
(Figure 9, Item 14) on platform (Figure 9, Item 7).
12. Install gasket (Figure 9, Item 4), junction block (Figure 9, Item 1), four washers (Figure 9, Item 3) and screws
(Figure 9, Item 2) on platform (Figure 9, Item 7).
13. Install electrical harness (Figure 9, Item 10), washer (Figure 9, Item 6) and bolt (Figure 9, Item 5) on platform
(Figure 9, Item 7).
14. Install four tiedown straps (Figure 9, Item 11) on electrical harness (Figure 9, Item 10) and platform (Figure 9,
Item 7).
Figure 9. Electrical Harness and Junction Block.
0220