TM 5-3805-263-14&P-1
Operating Techniques
3.
Lower the left lift cylinder to set the blade to the
depth of the ditch.
4.
Set the right lift cylinder to deliver the material onto
the slope between the tandems, without cutting.
5.
Lean the front wheels slightly to the right.
6.
Another pass is required to move the material up the
slope and onto the shoulder. Spread the material and
finish the final grade.
67