TM 5-3805-261-34TRANSMISSION MAINTENANCE. (cont)5-5.ControlCables.(Sheet 2 of 8)REMOVAL1.Remove three bolts (1), washers(2), cover (3) and gasket (4,Figure 5-17) from front ofoperator’ s panel console.Discard gasket (4). Remove allgasket material from mountingsurfaces.2.Loosen nut (8, Figure 5-18).3.Remove bolt (5), washer (6) androd end (7).4.Remove two nuts (8) and starwasher (9).5.Loosen nut (13).6.Remove bolt (10), washer (11) androd end (12).7.Remove two nuts (13) and starwasher (14).NOTEAll wire, cable and harnessassemblies must be taggedbefore disconnecting to aidin installation.8.Remove lockwasher (15), nut (16),lockwasher (17) and nut (18,Figure 5-19).9.Remove bolt (19), washer (20) andclip (21) from under right sideof cab.10. Disconnect cables (55 and 56)through cab floor.Go to Sheet 35-18Figure 5-17.Figure 5-18.Figure 5-19.
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business