TM 5-3805-261-34FRAME MAINTENANCE.16-3.ArticulationHitchBearing.(Sheet 7 of 7)INSTALLATION17. Install shim(s) (7, Figure16-33). Number of shim(s) (7) isdetermined by minimum measurementtaken in step 15.18. Position items 6 and 5 as anassembly over bearing (8) on topof lower pin bore of front frame.19. Install seven bolts (3) andlockwashers (4). Tighten sevenbolts (3) to 75 ft-lb torque.20. Install spacer (2) on bearing (8).21. Install fitting (1).22. Remove floor jack.23. Using clean grease, lubricatefitting (1). Refer to LO5-3805-261-12.NOTEReturn 130G Grader tooriginal equipment condition.End of TaskFigure 16-33.16-21/(16-22