• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
FUEL TRANSFER PUMP MAINTENANCE (MODELS 130G, 130GSCE, AND 130GNSCE) - Continued
FUEL TRANSFER PUMP MAINTENANCE (MODELS 130G, 130GSCE, AND 130GNSCE) - Continued

Maintenance Manual For Grader, Road, Motorized, Diesel Engine Driven, Heavy, Commercial Construction Equipment
Page Navigation
  72    73    74    75    76  77  78    79    80    81    82  
img
TM 5-3805-261-23-2
FUEL TRANSFER PUMP MAINTENANCE
(MODELS 130G, 130GSCE, AND 130GNSCE) - CONTINUED
0281 00
ASSEMBLY - CONTINUED
10.
Install new preformed packing (30) on pyramid side of
20
valve (31). Lubricate outer diameter of valve with
29
clean diesel fuel.
30,31
11.
Install new preformed packing (30) and valve (31) as
27
an assembly and washer (27) in piston (29).
397-1414
12.
Install piston assembly (28).
20
13.
Install spring (22).
28
14.
Install new preformed packings (24 and 25) in cover
(26).
15.
Position valve (23) in cover (26).
16.
Position cover (26) on housing (20). Valve (23) must
seat in spring (22).
17.
Install two bolts (15).
22
23
24
25
15
26
397-1415
INSTALLATION
1.
Install new preformed packing (21). Lubricate outer
diameter of new preformed packing with clean diesel
21
fuel.
397-1416
0281 00-7


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.