• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
ROCKER ARM ASSEMBLY MAINTENANCE - Continued
ROCKER ARM ASSEMBLY MAINTENANCE - Continued

Maintenance Manual For Grader, Road, Motorized, Diesel Engine Driven, Heavy, Commercial Construction Equipment
Page Navigation
  38    39    40    41    42  43  44    45    46    47    48  
img
TM 5-3805-261-23-2
ROCKER ARM ASSEMBLY MAINTENANCE - CONTINUED
0273 00
ADJUSTMENT
NOTE
The following step is for locating number one cylinder Top Center (TC).
1.
Remove starting motor (59) on right side of engine (WP 0067 00).
2.
Install engine turning gear on starting motor mounting flange.
NOTE
In the following steps, the engine is viewed from the flywheel end.
3.
Turn engine clockwise 30 degrees, using engine turn-
59
ing gear to remove timing gear play.
4.
Remove plug (60).
5.
Turn engine counterclockwise, using engine turning
gear and ratchet. Look through hole where plug (60)
was removed for threaded hole in flywheel where 3/8-
16NC bolt can be installed. If hole is passed, repeat
step 3.
60
397-1321
0273 00-8


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.