TM 5-3805-261-23-1
BLADE FLOAT PILOT VALVE MAINTENANCE (CCE MACHINE)
THIS WORK PACKAGE COVERS
Removal, Disassembly, Cleaning and Inspection, Assembly, Installation
INITIAL SETUP
Equipment Conditions
Maintenance Level
Machine parked on level ground (TM 5-3805-261-
Unit
10)
Tools and Special Tools
Parking/emergency brake applied (TM 5-3805-261-
10)
Implements lowered to ground (TM 5-3805-261-
Materials/Parts
10)
Engine off (TM 5-3805-261-10)
Battery disconnect switch in OFF position (TM 5-
Packing, preformed (7)
3805-261-10)
Seal (6)
Blade float pilot valve wiring harness removed (WP
References
REMOVAL
CAUTION
NOTE
Tag hose and tube assemblies before disconnecting to aid in installation.
1.
Disconnect hose assembly (15) from elbow (13).
Remove and discard preformed packing (14).
6
1
4
5
2.
Disconnect hose assembly (1) from tee (3). Remove
2
and discard preformed packing (2).
3
3.
Disconnect hose assembly (6) from connector (4).
Remove and discard preformed packing (5).
7
4.
Disconnect hose assembly (7) from connector (9).
Remove and discard preformed packing (8).
8
5.
Remove bolt (10) and washer (11).
9
6.
Remove blade float pilot valve (12).
15
14
13
12 11
10
397-669