TM 5-3805-261-23-1
STARTING MOTOR REPLACEMENT - CONTINUED
0067 00
CLEANING AND INSPECTION
Clean and inspect all parts in accordance with WP 0021 00.
INSTALLATION
1.
Position new gasket (22) and starting motor (23) on
22
flywheel housing.
23
397-224
NOTE
15
14
Make sure bolts are starter mounting bolts.
16 17
18 19
2.
Install clamp (13), three washers (14), and bolts (15).
13
20 21
3.
Position wire assemblies (17, 18, and 19) on terminal
stud (16).
4.
Install new lockwasher (20) and nut (21). Tighten nut
to 22 lb-ft (30 Nm).
14
15
397-2053
397-223
0067 00-4