TM 5-3805-261-20
FUSE BOX MAINTENANCE. (cont)
7-64.
NATO Slave Receptacle. (Sheet 4 of 4)
INSTALLATION (cont)
5.
Position wire assemblies (13, 12 and 11)
and cable assembly (23, Figure 7-90).
6.
Install washer (10) and nut (9).
7.
Position cable assembly (8, Figure 7-89).
8.
Install washer (7).
9.
Position wire assembly (6), cable assembly
(5), wire assembly (4) and cable assembly
(22).
10.
Install washer (2) and nut (1) on starting
motor (3).
NOTE
Return
130G
Grader
to
original
equipment condition.
Figure 7-90
Figure 7-89
End of Task
7-158