TM 5-3805-261-20
OPERATORS PANEL CONSOLE MAINTENANCE.
(cont)
7-31.
Main Circuit Breaker. (Sheet 2 of 2)
REMOVAL
1.
Remove two lock nuts (1) and washers (2)
from main circuit breaker (4, Figure 7-46).
NOTE
All
wire,
cable
and
harness
assemblies must be tagged before
disconnecting to aid in installation.
2.
Disconnect two wire assemblies (3).
CLEANING
Clean all parts. Refer to Chapter 2.
INSPECTION
Inspect all parts. Refer to Chapter 2.
INSTALLATION
1.
Connect two wire assemblies (3) to main
circuit breaker (4, Figure 7-46).
2.
Install two washers (2) and lock nuts (1).
NOTE
Return
130G
Grader
to
original
equipment condition.
Figure 7-46
End of Task
7-88