TM 5-3805-261-20
COOLING SYSTEM MAINTENANCE. (cont)
6-43.
Coolant Pump. (Sheet 6 of 6)
INSTALLATION (cont)
10.
Install two bolts (9) and bolts (8 and 7,
Figure 6-108).
11.
Install two clamps (12).
12.
Install bushing (6), elbow (5) and connector
(4) in front of coolant pump (20).
13.
Position clamp (3).
14.
Connect hose (2).
15.
Install clamp (3).
16.
Connect hose (13) to elbow (16) on front,
left side of engine.
17.
Install two clamps (1).
NOTE
Return
130G
Grader
to
original
equipment condition.
18.
Start engine. Refer to TM 5-3805-261-10.
19.
Check coolant pump (20) and hoses on
front, left side of engine, for leaks. Refer to
paragraph 6-41.
20.
Stop engine.
Figure 6-108.
End of Task
6-154