TM 5-3805-261-20FUEL SYSTEM MAINTENANCE. (cont.)6-16.AirPrecleaner.(Sheet 3 of 3)INSTALLATION1.Install two clamps (6) and hose (5) onbody (9, Figure 6-40).2.Install body (9) on air cleaner andconnect hose (5) on tube.3.Tighten bolt (8) and nut (7) in clamp(10). Tighten nut (7) to 18 ft-lb torque.4.Install clamp (4) and hood (3) on body(9, Figure 6-39).5.Tighten bolt (2) and nut (1). Tightennut (1) to 18 ft-lb torque.NOTEReturn 130C Grader to originalequipment condition.Figure 6-40.Figure 6-39.End of Task6-58
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business