TM 5-3805-261-10
ADVANCED OPERATION AND OPERATOR TIPS - CONTINUED
0006 00
TRAVELING AND EARTH MOVING OPERATIONS - CONTINUED
Right-Hand Ditch Cleanup - Continued
4.
Set the left lift cylinder to deliver the material onto the
slope between the tandems, without cutting.
397-987
5.
Lean the front wheels slightly to the left.
397-988
6.
Another pass is required to move the material up the
slope and onto the shoulder. Spread the material and
finish the final grade.
397-989
0006 00-17