TM 5-3805-293-23-4
0212
INSTALLATION CONTINUED
N OT E
Install all lines as marked and tagged during removal.
18. Install two new O-rings (Figure 24, Item 4) and connect two tubes (Figure 24, Item 6 and 11) to pump
(Figure 24, Item 5).
19. Install four clamps (Figure 24, Item 1), eight washers (Figure 24, Item 3), and bolts (Figure 24, Item 2) on two
tubes (Figure 24, Items 6 and 11).
20. Route hose (Figure 24, Item 9) on machine.
21. Install new O-ring (Figure 24, Item 10) and connect hose (Figure 24, Item 9) to tube (Figure 24, Item 11).
22. Route hose (Figure 24, Item 8) on machine.
23. Install new O-ring (Figure 24, Item 7) and connect hose (Figure 24, Item 8) to tube (Figure 24, Item 6).
Figure 24. AWD Pump Right-Side Hose-to-Tube Connections.
0212