TM 5-3805-293-23-4
0211
INSTALLATION CONTINUED
17. Install two clamps (Figure 36, Item 14), washer (Figure 36, Item 16) and bolt (Figure 36, Item 15) on two tubes
(Figure 36, Items 13 and 12) and left-side of machine (Figure 36, Item 17).
18. Install new O-ring (Figure 36, Item 10) and connect hose (Figure 36, Item 8) to tube (Figure 36, Item 13).
19. Install new O-ring (Figure 36, Item 11) and connect hose (Figure 36, Item 9) to tube (Figure 36, Item 12).
20. Install two clamps (Figure 36, Item 5), spacer (Figure 36, Item 3), washer (Figure 36, Item 4) and new locknut
(Figure 36, Item 2) on tube (Figure 36, Item 1) and left side of machine (Figure 36, Item 17).
21. Install new O-ring (Figure 36, Item 6) and connect hose (Figure 36, Item 7) to tube (Figure 36, Item 1).
Figure 36. Left-Side Tubes.
0211
Change 1